Work Scope: Sakhalin-1 Project: Odoptu Onshore Facilities, North Well Site, South Well Site, Chayvo OPF.
Installation of more than 35 conductors to the depth of 40 meters to 72 meters with conductor clearing during the period from 2014 till 2019.
Scope of Work: Odoptu Onshore Facilities. Odoptu Wellsite-2 (North) Expansion. NWS: 88 piles (406x12,7 mm), 17 piles (508x12,7 mm), 143 piles (530x12,7 mm), 647 piles (762x12,7 mm), 28 piles (762x19 mm). Total of 923 piles to depths ranging from 8 to 25 meters. Work scope includes welding, drilling and driving of piles. Period of work-November-2014 to May-2016 (expected date).
Scope of Work:Odoptu Temporary Offloading Facility (TOF). Odoptu Wellsite-2 (North) Expansion. TOF: 2533 Sheet piles, 58 Anchor piles, 55 Y-piles, 60 Mooring piles, 14 Fender piles driven to average depth of 10 meters. Period of work -December-2014 to October-2015
Scope of Work: Odoptu Onshore Facilities. Odoptu Wellsite-2 (North) Expansion. Rig Rails piles installation: 84 piles (762x19 mm, 3 and 4 joints) driven to average depth of 40 meters. Work scope included welding, drilling and driving of piles. Period of work September-2014 to December-2014
Scope of Work:Odoptu Onshore Facilities. Odoptu Wellsite-2 (North) Expansion. Gas Injection Compression Unit (GIC). Work scope included welding, drilling and driving of pile.
Scope of Work: Chayvo Well Site Expansion – Predominantly brownfield construction (with very tight clearances)completed the installation of 132 each 530mm piles, 26 each 324mm piles, 28 each 762mm piles. Plus pile fabrication, pile cap welding and fireproofing works.
Scope of Work: Chayvo AD Pipeline – Installation of approximately 160 each pile ranging from 324mm to 762mm diameter pile to a depth ranging from 14 meters to 20 meters. Installation and extraction of over 500 sheet pile pairs.
Scope of Work: Chayvo – 2 each sheet pile hot tap boxes for the Orlan Pipeline.
Scope of Work:Chayvo COE – Installation of approximately 600 pile ranging from 324mm to 762mm diameter to a depth ranging from 15 meters to 20 meters.
Scope of Work: Odoptu Valve Station – Installation of approximately 45 pile at 3 each valve stations along the Odoptu pipeline route. Valve station pile 530mm in diameter installed to a depth of 14 meters.
Scope of Work: Odoptu OPF Site – Installation of over 1500 each facility pile ranging from 406mm to 762mm diameter to a depth ranging from 14 meters to 20 meters.
Scope of Work: Odoptu Drill Site – Drilled to a depth of 21 meters through permafrost to assist the installation of 5 each conductors.
Scope of Work: Odoptu Rig Rails – Installation of over 200 each 762mm diameter rig rail pile to a depth of 30 meters.